OS
← Bow Thruster

Tunnel Thruster

medium
Tunnel-type bow and stern thrusters with electric or hydraulic drive

Known Models (4)

Brunvoll Tunnel Thruster FU
Brunvoll Tunnel Thruster FU
300-3500 kW · 1500.0 kW · Seawater · Tunnel Thruster Electric
power_kw: 1500
type: Tunnel Thruster Electric
Common Failures:
  • • Propeller blade tip erosion
  • • Main bearing wear
  • • Shaft seal leakage
  • • Clutch engagement failure (if fitted)
Service: Brunvoll — strong in offshore/ferry segment. Fixed pitch — direction reversal via motor. Annual gear inspection.
Spares: Brunvoll: Getriebeöl und Dichtungen an Bord. Lead time: 3-6 Wochen.
Kawasaki Marine Bow Thruster
Kawasaki Marine Bow Thruster
500-3000 kW · 1800.0 kW · Seawater · Tunnel Thruster
power_kw: 1800
type: Tunnel Thruster
Common Failures:
  • • Hydraulic motor leak (hydraulic type)
  • • Tunnel grid damage
  • • Shaft alignment issue
  • • Control valve malfunction
Service: Standard on Japanese-built bulkers/tankers. Hydraulic version requires HPU maintenance. Test before each port call.
Spares: Kawasaki: Getriebeöl und Dichtungen an Bord. Lead time: 3-6 Wochen.
Rolls-Royce (Kongsberg) Kamewa TT Series
Rolls-Royce (Kongsberg) Kamewa TT Series
500-4000 kW · 2500.0 kW · Seawater · Tunnel Thruster Electric
power_kw: 2500
type: Tunnel Thruster Electric
Common Failures:
  • • VFD fault
  • • Thruster motor bearing failure
  • • Gear reduction unit oil leak
  • • CPP hub seal failure
Service: Kamewa TT series. VFD enables soft start and speed control. Annual gear oil change. Propeller inspection at drydock.
Spares: Rolls-Royce (Kongsberg): Getriebeöl und Dichtungen an Bord. Lead time: 3-6 Wochen.
Wärtsilä (Lips) Tunnel Thruster CT/FT
Wärtsilä (Lips) Tunnel Thruster CT/FT
500-5000 kW · 2000.0 kW · Seawater · Tunnel Thruster Electric
power_kw: 2000
type: Tunnel Thruster Electric
Common Failures:
  • • Propeller blade erosion
  • • Shaft seal leakage
  • • Motor winding fault
  • • Gear unit bearing failure
Service: Inspect propeller at drydock. Gear oil analysis annually. Motor insulation test annually. Test before arrival at every port.
Spares: Wärtsilä (Lips): Getriebeöl und Dichtungen an Bord. Lead time: 3-6 Wochen.