OS
← Inert Gas Systems

Flue Gas IG System

medium
Flue gas type inert gas systems using boiler exhaust

Known Models (6)

Aalborg (Alfa Laval) Aalborg IG System
Aalborg (Alfa Laval) Aalborg IG System
variable · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
Common Failures:
  • • Scrubber packing deterioration
  • • Blower motor failure
  • • Valve corrosion
Service: Alfa Laval product line. Common on Danish-designed tonnage.
Spares: Aalborg (Alfa Laval): Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Hamworthy (Wartsila) Hamworthy IG System
Hamworthy (Wartsila) Hamworthy IG System
variable · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
Common Failures:
  • • Scrubber tower issues
  • • Deck seal malfunction
  • • Blower bearing wear
Service: Legacy Hamworthy — now under Wartsila brand. Same service network.
Spares: Hamworthy (Wartsila): Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Smit Gas Smit IG Flue Gas System
Smit Gas Smit IG Flue Gas System
variable · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
Common Failures:
  • • Scrubber corrosion
  • • Blower failure
  • • O2 analyzer calibration drift
Service: Dutch manufacturer. Service via Smit Gas worldwide.
Spares: Smit Gas: Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Wartsila (Moss) Moss IG 5000
Wartsila (Moss) Moss IG 5000
5000 m3/h · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
capacity_m3h: 5000
o2_outlet_pct: <5
Common Failures:
  • • Scrubber tower packing degradation
  • • Deck seal water level failure
  • • Blower bearing wear
  • • O2 analyzer drift
Service: O2 content below 5% at outlet. Scrubber water pH monitoring. Annual blower overhaul.
Spares: Wartsila (Moss): Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Wartsila (Moss) Moss IG 10000
Wartsila (Moss) Moss IG 10000
10000 m3/h · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
capacity_m3h: 10000
Common Failures:
  • • Scrubber corrosion
  • • Deck seal failure
  • • Non-return valve stiction
  • • Blower vibration
Service: Mid-range capacity for Suezmax/Aframax tankers
Spares: Wartsila (Moss): Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.
Wartsila (Moss) Moss IG 20000
Wartsila (Moss) Moss IG 20000
20000 m3/h · Inert Gas (N2-rich, <5% O2) · flue_gas
type: flue_gas
capacity_m3h: 20000
Common Failures:
  • • Scrubber packing failure
  • • Blower bearing seizure
  • • Deck water seal failure
  • • IG main valve corrosion
Service: VLCC capacity. Dual blower setup. Annual scrubber inspection.
Spares: Wartsila (Moss): Spezialteile per Hersteller. Lead time: 4-8 Wochen. Gasdetektions-Sensoren an Bord.